House drain with Drymat ®
The procedure 1. Comprehensive humidity analyse Wall dampness, wall and room temperature and relative humidity are measured with approved methods. From these measuring data a protocol is provided to determine the best installation point of the system.
2. Easy installation After assembly of system the effected parameters are optimally adjusted according to the prevailing circumstances.
3. The drying process begins A controlling measurement is done after 6 - 12 months which will show a considerable drying. The parameters can be specific adjusted during the drying process.
4. The process of the drying is recorded until the guaranteed values are reached. The drying process is usually finished after 6 - 18 months. The system is now an inherent part of the building and works in continuous operation. Humidity cannot enter again - Your house remains dry.
Advantages
Please contact us for more information.
|


